Incoming Feed Rate
The amount of fruit presented to the line over a defined period.
Capacity planning starts with the fruit, grade rules and downstream packing route—not with a single machine number. Use this page to separate the four capacity definitions and prepare the inputs needed for a project review.
Follow the material flow from incoming fruit to packing and dispatch.
Incoming fruit, sorter throughput, accepted-grade output and packing demand describe different points in the same project. Keeping them separate makes bottlenecks easier to see.
The amount of fruit presented to the line over a defined period.
The flow the configured sorting section processes under stated fruit and presentation conditions.
The portion directed to defined commercial grades after sorting and other routes are considered.
The quantity the packing and dispatch route can receive, pack and move forward.
Infeed & presentation is an influencing condition—not a fifth capacity definition. Fruit separation, spacing, surface condition and line handling affect the practical result.
These formulas explain the relationship between fruit flow, accepted grades and packing demand. They do not produce a guaranteed equipment selection.
Start with what you know. You can leave fields incomplete and return later; the board highlights the information that still needs confirmation before a project assessment.
A grade rule describes a commercial decision. The physical line still needs to consider outlet position, share of the flow, transfer space and the receiving packing route.
A high-share grade may need more than one physical outlet when the downstream packing route cannot receive the full flow at one point.
Conversely, several commercial grades may be managed through a defined handling route when the project rules and packing operation allow it.
Define fruit presentation, inspection scope, grade routes, packing interfaces and utility requirements together before the line layout is fixed.
Start with project inputs →Compare the required incoming flow with current sorting, outlet and packing constraints. Identify which section needs additional capacity.
Map the expansion route →Review available space, conveyor interfaces, control signals, outlet loading and the practical installation window before choosing an upgrade path.
Prepare retrofit inputs →Share the information you already have. GELGOOG can use the project inputs to identify the capacity questions, line interfaces and sample-test conditions that need to be confirmed next.